WisutWood Fit-in · Whole timber buildings & guest-room furniture
Wardrobes, Dressing Tables and Luggage Racks for Hotel and Resort Guest Rooms
WisutWood makes the casegoods for hotel and resort guest rooms to your drawings: open and sliding-door wardrobes, dressing tables, desks, luggage racks, minibar units and bathroom shelving. Every room is repeated to one spec, with the species, sizes and coating system chosen to match the project drawings, and delivered to site across southern Thailand and the islands, or nationwide by chartered truck for project quantities.
What to think through before you order
- A wardrobe has to fit the real wall recess, which rarely matches the drawing exactly
- Many rooms have to share one wood tone and one surface finish
- It all has to survive heavy use and daily housekeeping
- The pieces have to fit through the lift and the room door
What we make
- Hinged and sliding-door wardrobes
- Dressing tables and in-room desks
- Timber luggage racks
- Minibar and coffee-station shelving
- Bedside cabinets and drawer units
- Bathroom shelving
Every piece is made to the size, species and drawing you specify — nothing is off the shelf.
Woodwork used in related projects
Wood species that suit Guest-room Casegoods
- Takhian Thong In stock Moisture-resistant, suited to seaside work · figures are "merawan" trade-group values
- Sadao Thiam In stock The mill's main timber · figures come from a 10-year plantation study (they vary with tree age) — awaiting the factory's own test results
- Rubberwood glued panel In stock The standard for budget furniture · must be kiln-dried and preservative-treated
Guest-room casegoods can be coated at the factory in either of two systems: lacquer (heavy use and frequent wiping down) or food-grade wax
Compare every species in the wood guide →Real projects — Guest-room Casegoods
Fair House Villas & Spa
Koh Samui
“Delivered on schedule, beautifully finished furniture”
Dalah Homestay
Surat Thani
“The best fit for our budget”
What project owners ask us first
How long does a project take to produce?
Roughly 7-30 working days after the design is confirmed and the deposit is paid, depending on the design and the number of pieces. The actual time for each job is stated in the quotation.
Is there a minimum order for project work?
We take on jobs with a total order value of 15,000 baht or more (this is a condition for taking the job on, not a product price).
Can you deliver to the islands, and how is freight charged?
Freight to the islands is charged at cost: both the ferry (vehicle barge) and the road distance. It is stated in the quotation.
Can you build to our architect’s drawings and repeat the same spec in every room?
Yes. We build from whatever your architect or interior designer sends — drawing files, reference images or a BOQ — and repeat the same spec across every room, keeping dimensions, species, tone and coating system consistent across the project. A first sample piece can be approved before the production run starts.
Can we see sample work and visit the factory before deciding?
You are welcome to book a visit to see real timber and sample work and tour the factory, during working days and hours.
Questions before you order — Guest-room Casegoods
Can hotel wardrobes be made to the size of the room?
Yes. We build to the real recess and the real ceiling height. Send the room plan with width, depth and height and the positions of any sockets or switches the unit has to work around, and our team will take it off and quote.
How high should a luggage rack be?
The usual height lets a guest set a suitcase down and open it without stooping, and it should be wide enough for the largest case the hotel expects. We build to the size the project specifies, or suggest one from the room drawings you send.
Is it all solid wood, or a mix of materials?
The frame and every visible surface are solid wood. Cabinet backs and drawer bottoms that carry no load can be panel board where the drawings allow, which keeps the budget down without giving up frame strength.
Can we have one sample room before ordering the whole project?
Yes, and we recommend it. The first room is there to check dimensions, wood tone, finish and hardware; the rest of the run follows once it is approved.
Can you deliver casegoods to another province?
We deliver to site across upper southern Thailand as a matter of course (Surat Thani, Nakhon Si Thammarat, Krabi, Phuket, Phang Nga, Ranong, Chumphon, Phatthalung and the islands). Large projects outside that area are delivered nationwide by chartered truck. Quoted prices exclude freight, which is worked out from distance and volume. We manufacture and deliver only, with no installation service — your own carpenter fits the work.
Related articles
-
Ordering Headboards and Dressing Tables for a 15-Room Hotel: How Long, and What to Prepare
The timeline and the paperwork for ordering solid wood headboards and dressing tables for a multi-room hotel — five steps from drawings to delivery on site.
Start your Guest-room Casegoods project — send drawings or get an instant estimate
Send us a drawing or a reference photo — our team will get back to you with a quotation.